top of page

polyflor_expona commercial

Polyflor-1380x400.png

Polysafe Expona Commercial - is recommended for commercial and also residential areas that require a hardwearing floorcovering which is attractive, modern and easy to maintain. Applications include retail, office, hospitality, healthcare, aged care and educational facilities.

Realistic timber, stone and abstract look designs in a variety of colours.

.Polyurethane (PUR) surface treatment to assist ongoing maintenance.

.Flooring designed to create inspirational commercial and residential spaces.

-  PRODUCT INFO  -

Properties:

0.55mm Wear Layer;

80 shades;

2.5mm Gauge.

Designed for use in commercial & residential settings (Use area 23/33/42);

Recommended Application:

.Cafe Shop

.Commercial Area

.Community Centre

.Hotel

.Office

.Residential

.School

.Shop / Retail

Available Size:

Expona Commercial

Wood Plank

101.6mm x 914.4mm x 2.5mm (THK.)

152.4mm x 609.6mm x 2.5mm (THK.)

152.4mm x 914.4mm x 2.5mm (THK.)

152.4mm x 1219.2mm x 2.5mm (THK.)

184.2mm x 1219.2mm x 2.5mm (THK.)

184.2mm x 1524mm x 2.5mm (THK.)

203.2mm x 1219.2mm x 2.5mm (THK.)

203.2mm x 1524mm x 2.5mm (THK.)

Stone Tile

.177.8mm x 1219.2mm x 5mm (THK.)

.304.8mm x 609.6mm x 5mm (THK.)

.600mm x 600mm x 5mm (THK.)

.914.4mm x 914.4mm x 5mm (THK.)

-  PRODUCT RANGE  -

-  INSTALLATION  -

.A moisture test must be carried out to ensure that the subfloor has dried out to a level consistent with the application of vinyl flooring. The test should be carried out using a hygrometer, in accordance with the instructions in BS 8203. The result should not exceed 75%RH, once equilibrium has been achieved.

.The adhesive used must be approved by Polyflor, to ensure full product compatibility.

.Products must be fully conditioned to the environment in which they are to be installed. See Polyflor installation instructions for details.

.Installation must be carried out in accordance with BS 8203, BS 8204 and the instructions of Polyflor.

.Suitable for use with underfloor heating up to 27°C. See Polyflor installation instructions for details.

.The subtle blending of shades and graining variation can best be obtained by the random shuffling of 3-4 packs of tiles.

-  MAINTENANCE  -

Initial Construction Clean

.The incorporation of a high quality, cross-linked UV cured polyurethane reinforcement provides superior cleaning benefits and life cycle maintenance savings.

 

.Remove all loose debris.

.Ensure that all traces of adhesive are removed from the surface of the floorcovering.

 

.Mop sweep or vacuum to remove dust and grit.

.Damp mop with a neutral detergent.

.If required, dry buff with a 1000 rpm plus rotary machine fitted with a suitable clean pad.

Daily Maintenance

.Mop sweep or vacuum to remove dust and loose dirt.

.If required, spot mop to remove stubborn marks, with a neutral cleanser.

.If required, dry buff to restore finish.

Weekly/Monthly Maintenance

.Assess the appearance of the floor.

 .If required, scrub with a scrubber dryer fitted with suitable pads, and using neutral cleanser (pH 7 to 9).

 .If required, dry buff to restore finish.

Applying Floor Dressing

.Should you wish to apply a floor dressing to the floorcovering to provide extra protection in heavily trafficked areas, please follow details of the procedure below.

. Using an applicator and tray, or Kentucky mop with wringer and bucket, the first coat should be applied thinly and evenly across the floor, to within 200mm of the skirtings. It should then be left to dry. This normally takes approximately thirty minutes, depending on the ambient conditions and the thickness of the coating.

.When the first coat is dry, a second coat should be applied at right angles to the direction of the first. Subsequent coats should be applied at right angles, and the final coat should be applied right up to the skirting.

. Two to three thin coats are usually sufficient to provide excellent resistance to abrasion, scuffing and removal of black heel marking. However, be guided by your own periodic assessments for the particular location.

. In order to minimise costs, subsequent polish applications may be applied only to traffic paths.

 

. Periodically – generally every six months – assess the appearance of the floor. If there is an unacceptable build-up of polish, this should be stripped and reapplied, as per the instructions above.

 .

-  SHIPPING INFO  -

Normally shipping delivery takes around 8-10 weeks from your orders on. If you require any express services, delivery time can be upgraded as 2-4 weeks.

(For any questions, please feel free contact us during business hours for better information.)

If you have any questions to our products, please feel free to contact us via:  ricabldg@hkstar.com; or
contact us by +852-2398-7293 or whatsapp us by +852-9165-5989 during business hours
(Mon-Fri 10:00 - 18:00).

aDDRESS

Hong Kong:
( Rica Building Materials Co., Ltd. )

Room 1002, 10/F, Wing Lee Ind. Building, 54-58 Tong Mi Road, Mongkok, Kowloon, H.K.





- - - - - - - - - - - - - - - - - - - - - 

Macau:
(Ye Hua Matieral Co.,  Ltd.)

Room 217, 2/F, Lee Cheong Industrial Building,
No. 56-58 Beach Road, Macau Racecourse, Macau

Info

Hong Kong:

Monday - Friday

10:00 - 18:00

(Except public holiday)

Tel: +852-2398-7293

Fax: +852-2397-0019

Email: ricabldg@hkstar.com

Whatsapp: +852-9165-5989

- - - - - - - - - - - - - - - - - - - - -

Macau:

Monday - Friday

09:00 - 18:00

Saturday

09:00 - 13:00

(Except public holiday)

Tel: +853-2883-3886

Fax: +853-2883-3878

Email:

yehua-material@outlook.com

Whatsapp: +853-6526-6698

 

Social

  • Facebook
  • Pinterest
  • Instagram
  • YouTube

language

ENG

中文(繁)

© 2025 by RICA.

bottom of page